Having budget costed the sewer diversion, including the £5K bond that Wessex Water require, we are likely to be out of pocket to a tune of £12-15K for the diversion. Frankly, I would much rather spend that (if we had it) on something useful. After a re-think, we make the decision to remove the rear extension. Continue reading
back to the drawing board
Reply