week 23: a sealed envelope

bi-folding doors installed

The last of the doors and windows are fitted to the extension area. The last of these units to be fitted was the bi-folding doors on the lower ground floor. With some of the scaffolding out of the way temporarily (to allow the balcony to be built), we are able to see what the house will look like.

More importantly, we are now able to start proper drying-out. A de-humidifier and a heater are now set-up and the space is now heated!