The external insulation progressed well (until we ran out) and the house is beginning to be transformed. I’m sure we’re the talk of the neighbourhood – ‘what on earth are they doing?’ Weather permitting, the rendering will start next week. and it will begin to look a bit more normal.
Another week, or so and the insulation should be complete on the external – a fair bit to do on internal insulation works – particularly suspended floor and loft.
Hi
very interested to know what type of EWI you decided to go with over your filled cavity walls?
Thanks
Hi, You may wish to refer to the previous post (week 27) which gives you the details you need
Thanks
Ian