week 17 and 18: extension roof progresses

vapour barrier being laid

The vapour control layer to the new extension roof is now laid. The roof will be a warm roof construction, so the insulation will sit on top of the vapour control, followed by the final waterproof membrane. Before that, the roof light kerbs are cut in. The studio space below the roof will need very good natural daylight and we can’t fit windows along the long (party) wall. So, we are fitting three large roof lights instead.

rooflight kerb

The kerbs are flat pack units from Velux. Whilst they are fine for accommodating the Velux window units, they are not as well insulated as I would have expected. We will need to review the abutment of the kerb with roof insulation to see how we can add/improve the performance.