week 3: ‘strongboys’ ready!

Scaffolding went up on Tuesday followed by the installation of an array of Strongboy supports and Acro props in preparation for the demolition of the side wall and removal of the concrete lintel at the rear, which supports the slab above the former loggia.

The picture above shows the matrix of Acro supports. The concrete lintel being removed (with white render coat) is just visible at the top right of the picture.

Now ready for some serious demolition!